• Stars
    star
    5
  • Rank 2,861,937 (Top 57 %)
  • Language
    C++
  • Created almost 4 years ago
  • Updated over 3 years ago

Reviews

There are no reviews yet. Be the first to send feedback to the community and the maintainers!

Repository Details

c++,Qt练手写的德州扑克,连接基于tcp,包括客户端和服务器端,比较粗浅,请指正

More Repositories

1

Secured-Constraints-Unit-Commitment-SCUC-model-of-Power-system

Secured Constraints Unit Commitment model of Power system, including the model based on AC flow equation and DC flow equation. Only the constraints in pre-contingency state are considered. There is a piecewise function expression for power generation costs. However, I'm sorry that the version is relative old, and it may be difficult to read or modify. 电力系统安全约束单位承诺模型,包括基于交流潮流方程和直流潮流方程的模型。 仅考虑意外前状态下的约束。 有一个用于发电成本的分段函数表达式。 但是,很抱歉该版本相对较旧,可能难以阅读或修改。 Besides, note that the model is based on the Matlab, Yalmip, and the solver is Gurobi. It can be changed to other solvers, such as Cplex, by modifying the parameter 'gurobi' in sentence 'ops = settings('solver','gurobi''. 此外,请注意,该模型基于Matlab,Yalmip,求解器为Gurobi。 通过修改句子'ops = settings('solver','gurobi'中的参数'gurobi',可以将其更改为其他求解器,例如Cplex。 If you have any idea on improving this model, please contact me. 如果您有任何改进此模型的想法,请联系我
MATLAB
82
star
2

Mixed-Heat-Gas-Power-System-Scheduling

Maintenance Model of Power System with Matlab and Yalmip, including the maintenance of branches and generators, and a partial mantenance is allowed for branches. The Object Functions are 1.Maximize the minimum reserve rate, 2.Minimize the cost, 3. Minimize the Variance of reserve rate(resulting in a long solution time) 使用Matlab和Yalmip进行电力系统维护的模型,包括分支机构和发电机的维护,并且分支机构可以进行部分维护。 对象函数是1.最大化最小储备率,2.最小化成本,3.最小化储备率的差异(导致较长的求解时间) Besides, note that the model is based on the Matlab, Yalmip, and the solver is Gurobi. It can be changed to other solvers, such as Cplex, by modifying the parameter 'gurobi' in sentence 'ops = settings('solver','gurobi''. 此外,请注意,该模型基于Matlab,Yalmip,求解器为Gurobi。 通过修改句子'ops = settings('solver','gurobi'中的参数'gurobi',可以将其更改为其他求解器,例如Cplex。 If you have any idea on improving this model, please contact me. 如果您有任何改进此模型的想法,请联系我.
MATLAB
40
star
3

Maintenance-Model-of-Power-System

Maintenance Model of Power System with Matlab and Yalmip, including the maintenance of branches and generators, and a partial mantenance is allowed for branches. The Object Functions are 1.Maximize the minimum reserve rate, 2.Minimize the cost, 3. Minimize the Variance of reserve rate(resulting in a long solution time)使用Matlab和Yalmip进行电力系统维护的模型,包括分支机构和发电机的维护,并且分支机构可以进行部分维护。 对象函数是1.最大化最小储备率,2.最小化成本,3.最小化储备率的差异(导致较长的求解时间)
MATLAB
16
star